Welcome to Regent Power Limited
Table of Contents
| EXECUTIVE SUMMARY |
| TABLES |
| Table 2.1 Chemical Composition and Physical Parameters of Natural Gas |
| Table-2.2 List of Materials & Equipment |
| Table 11.1 Summary of Community Consultation |
| Table 3.1 Concordance Analysis of EIA Requirements |
| Table 4.1 Monthly Average maximum Temperature |
| Table 4.3 Monthly Average Rainfall Data |
| Table 4.4 Monthly Average Humidity Data |
| Table 4.5 Mean Wind Speed (knot) |
| Table 4.6 Prevailing wind Direction |
| Table 4.7 Ambient Air quality |
| Table 4.8 Ambient Noise Level |
| Table 4.9 Ground Water Quality |
| Table 4.10 List of flora species in the project area |
| Table 4.11 Locally available bird species |
| Table-5.1 Checklist of Significant Environmental Impacts (SEAs) |
| Table 6.1 Occupational Noise Exposure Limits |
| Table-8.1: Quality Key Indicator’s Parameters Monitoring Program Format |
| Table 11.1 Summary of Community Consultation |
| FIGURES |
| Figure 2.1: Project Location in Bangladesh Map |
| Figure 2.2: Project Location in Upazila Map |
| Figure 2.3: Site Layout of Proposed RPL Power Plant Site |
| Figure 3.1: Bangladesh Environmental Impact Assessment Procedure |
| Figure 4.1: Environmental Study Area Map |
| Figure 4.2: Mean Annual of Rainfall of Bangladesh |
| Figure 4.3: Flood affected area of Bangladesh |
| ANNEXES |
| Annex-1 Approved TOR of EIA |
| Annex-2 HSE Policy of ECPVL |
| Annex-3 Equipment Supplier’s Catalog |


