Welcome to Regent Power Limited

Table of Contents

EXECUTIVE SUMMARY
 
TABLES
Table 2.1     Chemical Composition and Physical Parameters of Natural Gas
Table-2.2    List of Materials & Equipment
Table 11.1  Summary of Community Consultation
Table 3.1    Concordance Analysis of EIA Requirements
Table 4.1    Monthly Average maximum Temperature
Table 4.3    Monthly Average Rainfall Data
Table 4.4     Monthly Average Humidity Data
Table 4.5     Mean Wind Speed (knot)
Table 4.6     Prevailing wind Direction
Table 4.7     Ambient Air quality
Table 4.8     Ambient Noise Level
Table 4.9     Ground Water Quality
Table 4.10   List of flora species in the project area
Table 4.11   Locally available bird species
Table-5.1     Checklist of Significant Environmental Impacts (SEAs)
Table 6.1    Occupational Noise Exposure Limits
Table-8.1: Quality Key Indicator’s Parameters Monitoring Program Format
Table 11.1  Summary of Community Consultation
 
FIGURES
Figure 2.1: Project Location in Bangladesh Map
Figure 2.2: Project Location in Upazila Map
Figure 2.3: Site Layout of Proposed RPL Power Plant Site
Figure 3.1: Bangladesh Environmental Impact Assessment Procedure
Figure 4.1: Environmental Study Area Map
Figure 4.2: Mean Annual of Rainfall of Bangladesh
Figure 4.3: Flood affected area of Bangladesh
 
ANNEXES
Annex-1           Approved TOR of EIA
Annex-2           HSE Policy of ECPVL
Annex-3           Equipment Supplier’s Catalog

Go To 1, 2, 3, 4




Latest News

> View all news