Welcome to Regent Power Limited
Table of Contents
| EXECUTIVE SUMMARY |
| 1.0 INTRODUCTION |
| 1.1 Preamble/Background |
| 1.2 Scope of the Present Study |
| 1.3. Methodology |
| 1.4. Limitation |
| 1.5 EIA Team |
| 2.0 PROJECT DESCRIPTION |
| 2.1 Overview |
|
2.1.1 Location |
| 2.1.2 Land Requirement |
| 2.1.3 Water Requirement |
| 2.1.4 Electricity and Lube oil Requirement |
| 2.1.5 Gas Requirement as Raw Material |
| 2.1.6 Manpower Requirement |
| 2.1.7 Drainage and Discharge |
| 2.1.8 Present Status of the Project |
| 2.2 Power Station Design |
| 2.2.1 Site Layout |
| 2.2.2 Site Access |
| 2.2.3 The Power Block |
| 2.2.3.1 Power Generation Cycle |
| 2.2.3.2 Engine Design |
| 2.2.4 High Voltage Substation and Interconnection to the Grid |
| 2.2.5 Plant Control Systems |
| 2.2.6 Cooling Water System |
| 2.2.7 Effluent Disposal System |
| 2.2.7.1 Sewage Treatment |
| 2.2.8 Sludge Treatment and Disposal |
| 2.2.9 Fire Fighting System |
| 2.2.10 Hazardous Materials Storage |
| 2.3 Life Cycle Overview |
| 2.3.1 Construction Overview |
| 2.3.2 Decommissioning |
| 3. REGULATORY FRAMEWORK |
| 3.1 Government of Bangladesh |
| 3.1.1 Policy Considerations |
| 3.1.1.1 National Environmental Policy,1992 |
| 3.1.1.2 National Environment Management Action Plan, 1995 |
| 3.1.1.3 National Conservation Strategy, 1992 |
| 3.1.2 Bangladesh Legislative Regime |
| 3.1.3 Bangladesh EIA Process |
| 3.1.4 Environmental Standards |
| 3.2 World Bank/IFC Policies and Guidelines |
| 3.2.1 WBG Policy on EA and Project Categorization |
| 3.3 International Environment Conventions |
| 3.4 Concordance Analysis for Project Requirements |
| 3.4.1 Project Categorization and EIA Requirements |


